Cookies
We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy
The electrical, plumbing and drainage, and air-conditioning drawings for a house in Ghana, worked out room by room, with a registered engineer to review and sign them.
An upstairs bathroom that isn't over a wet room, a socket too close to the sink, an AC without its circuit: the MEP check lists what doesn't fit, and what to do.
Ask for a review and an engineer checks, marks up and signs your set. Their signature prints only while your plan and choices stay as they signed them.
Every point counted and every cable and pipe measured from the plan, for your quantity surveyor and your bill of quantities.
PDF sheet sets, DXF on standard E-, P- and M- layers, and the house with its MEP as an IFC model.
MEP stands for mechanical, electrical and plumbing: the drawings for everything in a house that isn't the structure. For a house in Ghana that's the electrical layout and wiring (lights, sockets, the board and circuits), the plumbing and drainage (water supply, tanks, soil and waste pipes, the septic tank and soakaway) and the air conditioning and ventilation.
Not until one reviews them. The sets are drawn and calculated from your floor plan and every sheet says 'for engineer's review'. Ask for a review on the Drawings page and a registered engineer checks the set, marks it up and signs it; their name and registration then print on the sheets. If your plan changes after they sign, the sheets stop printing their signature until the new version is reviewed.
It depends on the assembly. Many ask for architectural and structural drawings for a house; some also ask for electrical and plumbing layouts, and ECG asks for a certified wiring professional's certificate before it connects a new house. Ask your assembly's permit office; either way, your electrician and plumber can build from these sets, and they give your quantity surveyor counted points and measured runs.
From the number of people living in the house, with the British Standard formula used in Ghana, BS 6297: capacity = 180 litres a person + 2,000 litres, at least 2,720 litres, in two chambers. The soakaway is sized from a soil percolation test; until you have one, it's sized for a moderate soil and the drawing says so.
Yes. Download the PDF sets, the MEP drawings as DXF (one file a floor, on standard layers for electrical, plumbing and mechanical) that open in AutoCAD, BricsCAD or LibreCAD, or the house with its MEP as an IFC model for Revit and other BIM tools.
Read the guide: MEP drawings for a house in Ghana. The architectural and structural sets: architectural & structural drawings.